Detail News
Urban Project Song Da - Binh Tan

- Location: Tan Tao - Tan Binh District - Ho Chi Minh city
- The company signed a consultancy contract to perform consulting work procedures to improve project implementation.
- The company has implemented the agreement to compensate the people.
- On 14/09/2010 the company has admitted Dispatch: 12049/QD-UBND of Binh Duong People's Committee approving the detailed plan for urban construction rate of 1 / 500 Song Da  - Binh Tan Urban in Tan Tao and Binh Tri Dong A Ward, Binh Tan district.

  
 1. Location, scale and limited scope of the plan:

- Location: in Tan Tao and Binh Tri Dong A, Binh Tan district.

- The size of land planning: about 365.655m2

- Limiting the land:

+ East: adjacent existing residential areas bordering the project company and Le Thanh Hoang Nam.

+ The West: Armor Tham Luong - Ben Cat - Rach Up Water

+ South: baseline rate of IT projects.

+ North: Next Lan Tay Road (Road 2 extended-old)

  
 2. The structure of land use:

- Land for housing: approximately 57.87% 311.612m2

- Public land - regional service: 36.084m2, accounting for 9.87%

- Land grant green focus areas: 34.217m2, accounting for 9.36%

- Land transport at regional level: 83.742m2, accounting for 22.9%.

   
3. Functional areas of work items:

3.1. Housing improvement and embellishment of resettlement:

- Land area: 21.641m2

- Total number of apartments to keep reorganizing and resettlement of about 155 units (average 140m2/unit)

3.2. High-rise housing:

- Land area: 18.498m2

- Construction density: 35-40%

- Construction height: 15 floors.

- Total building floor area (excluding basement): 92.490m2

- Total apartments: 900 units.

- Population estimate: 3,592 people.

3.3. Group houses villas:

- Area subdivision: 30.705m2

- Area average: 350m2/lot

- Construction height: 2-3 floors.

- Building density 50-60%

- Total building floor area: about 46.000m2.

- Total units: 82 units.

- Population estimate: 328 people.

3.4. Group of adjacent cities:


- Land area: 54,838 m2.

- Area average: 140m2/lot

- The average building density: 70%.

- Average height: 3-4 floors

- Total building floor area: 135.000m2

- Total units: 390 units.

- Population estimate: 1,560 people.

3.5. Groups of social housing:

- Land area: 14.116m2

- Area average 140m2/lot

- Construction height: 2-3 floors.

- Building density: 70%

- Total building floor area: 26.460m2

- Total units: 100 units

- Population estimate: 400.

3.6. Service area - trade:

- Land area: 10,089 m2.

- Construction height: 10-15 floors

- Construction density: 50-60%

- Total building floor area: 60,000-75.000m2

3.7. Park public housing (schools)

- Land area: 17.518m2.

- Preschool

- School junior.

[Back]
Other News
Hydropower project Nậm Xây Nọi 2
Urban Projects Dan Phuong District Red Thai Ha Tay Province
 
Typical contruction
Industrial Projects
Transmission line substation
Traffic Engineering
Civil works
Irrigation Works
Hydropower projects
Statistic
Statistics :   43009
User online :   M
Information